Site Capacity & Specifications

3.5MW built and operational today, with a clear path to 5MW. 220 rack positions across a modular, expandable 8.8-acre facility.

3.5MW
Built & operational today
5MW
Total available position
220
Rack positions
8.8 ac
Total site footprint

Flexible capacity for every scale

From a reserved compute pod for a single team to full-site dedicated deployments. All infrastructure remains provider-owned under a clear site agreement.

Entry

Dedicated Pod

Custom pricing · Contact for availability

  • Reserved rack positions — no multi-tenant sharing
  • Buyer-specified GPU and networking configuration
  • Dedicated power and cooling allocation
  • Named account manager
  • Full chain-of-custody documentation
Request Info
Full Site

Site Anchor Tenant

Custom pricing · Contact for availability

  • Up to 5MW dedicated power commitment
  • Full 8.8-acre site with expansion rights
  • Buyer-customized modular buildout
  • Separate LOI / term sheet process
  • Legal and technical diligence package provided
Request Info

Site infrastructure at a glance

Full technical documentation and a site walkthrough are available to qualified prospects following NDA.

Category Specification Detail
Location 250 Disc Drive, Longmont, CO Operational
Site Area 8.8 acres total · 1.3 acres current footprint Expansion land available
Power — Built 3.5 MW operational Longmont Power utility-fed
Power — Available 5 MW total position Utility approval pathway established
Rack Positions 220 positions Expandable via modular deployment
Architecture Modular, containerized outdoor units Just-in-time capacity expansion
Uptime (Historical) 99.97% Continuous operation since 2018
Connectivity Regional fiber access Denver tech corridor proximity
Tenancy Private, dedicated No multi-tenant sharing
GPU Support NVIDIA H100 · H200 · B200 · B300 Buyer-specified hardware
Location
250 Disc Drive, Longmont, CO
Operational
Site Area
8.8 acres total · 1.3 acres current footprint
Expansion land available
Power — Built
3.5 MW operational
Longmont Power utility-fed
Power — Available
5 MW total position
Utility approval pathway established
Rack Positions
220 positions
Expandable via modular deployment
Architecture
Modular, containerized outdoor units
Just-in-time capacity expansion
Uptime (Historical)
99.97%
Continuous operation since 2018
Connectivity
Regional fiber access
Denver tech corridor proximity
Tenancy
Private, dedicated
No multi-tenant sharing
GPU Support
NVIDIA H100 · H200 · B200 · B300
Buyer-specified hardware

Full electrical plans, transformer documentation, and site survey available under NDA to qualified prospects.

Ready to discuss your compute requirements?

Tell us your power needs, timeline, and GPU requirements. Our team responds within 24 hours.

Request Information
Request Info